Free call sheet templateThe call sheet, field by field.

A call sheet tells every person where to be and when for one day of shooting. Here is the full structure of a professional call sheet, ready to rebuild in the tool you use.

One click, no account. The demo is filled with sample productions and rebuilt every day.

The fields of a call sheet

SectionWhat goes in itWho provides it
HeaderProduction title, company, shooting day number (day 3 of 8), dateProduction office
General callCrew call time, shooting call, estimated wrap, meal timeFirst assistant director
Key contactsProducer, director, first AD, production coordinator, with phone numbersProduction office
LocationsAddress of each set, parking, base camp, nearest hospital with addressLocation manager
Weather and lightForecast, temperature, sunrise and sunsetSecond assistant director
Scenes of the dayScene number, set, interior or exterior, day or night, pages, short description, cast numbersFirst assistant director
CastNumber, performer, role, pickup, make-up call, on-set callSecond assistant director
CrewDepartment by department: name, role, individual call timeProduction coordinator
Special notesEquipment arriving that day, vehicles, stunts, minors, safety notesDepartments
Advance scheduleThe scenes planned for the next shooting dayFirst assistant director

How to fill it in

  1. Start from the latest schedule. Check its date. A call sheet built from last week's version is the most common cause of a bad morning.
  2. Set the general call from the first shot. Work backwards: time to light, time to unload, travel.
  3. Give each performer their own times. Pickup, make-up and on-set are three different moments.
  4. Write addresses that a navigation app finds. Add the entrance to use and where to park.
  5. Have two people proofread. One checks times, the other phone numbers and addresses.
  6. Send once, to everyone, the evening before. If something changes, send a clearly marked revision.

Mistakes that cost a morning

  • Two versions in circulation. Name the file with the day number and a revision letter, and say which one replaces which.
  • No hospital. It takes one minute to add and it is the line you need when nobody has time to search.
  • Call times that ignore rest periods. Check last night's wrap before fixing the morning call.
  • Contacts missing for day players. People who join for one day are the ones who get lost.

The same call sheet from an application

Everything in the table above already exists somewhere: the shoot date in the calendar, the cast and their phone numbers, the crew, the gear arriving. In CrewDesk these facts are entered once. The demo keeps the finished call sheet with the project; a version built for your company can produce the sheet in your layout and send it to the day's crew.

Terms used on this page

Call sheetCall timeProduction coordinator

Questions

Asked before the first call

When should a call sheet be sent?

The evening before the shooting day, once the first assistant director and the producer have approved it. Early enough that people read it before going to sleep, late enough that it reflects the day's wrap.

Who makes the call sheet?

On larger sets, the second assistant director. On smaller productions, the production coordinator or the producer.

Does a small shoot need a call sheet?

Yes. Even for a crew of five, one page with the time, the address, the contacts and the plan avoids ten messages on the morning of the shoot.