The pre-production checklist: what must be true on day one

Problems on set are usually pre-production problems that arrived late. Use this list to find them early.

One click, no account. The demo is filled with sample productions and rebuilt every day.

Creative

  • Script or outline approved by the client
  • Shot list and storyboard for the complex scenes
  • References for look, wardrobe and set
  • Deliverables listed: lengths, formats, versions

Budget and schedule

  • Budget approved, with a contingency line
  • Shooting schedule built from the breakdown
  • Payment terms agreed and the first invoice sent
  • Insurance in place for the shoot dates

People

  • Key crew booked and confirmed in writing
  • Cast chosen, contracts and releases signed
  • Sizes collected and fittings scheduled
  • Travel and accommodation booked

Places and things

  • Locations scouted, with photos and practical notes
  • Permits requested and received
  • Camera, lighting and sound packages reserved
  • Props, wardrobe and set decor sourced and stored
  • Power, parking and catering arranged

The week before

  • Technical scout with heads of department
  • Call sheet sent the day before each shooting day
  • Weather plan for exteriors
  • Media, batteries and backups checked
  • Emergency contacts and nearest hospital on the call sheet

Make the checklist a template

The list barely changes from one shoot to the next. Save it once as a task template, apply it to each new project and assign each line to a person with a date. That is what task templates in CrewDesk are for.

How to use this checklist

Give each line an owner and a date, working backwards from the shoot. Review the list twice a week in pre-production. The lines that stay open longest are almost always approvals that depend on someone outside the team: chase those first.

Related templates

See the call sheet template, the equipment checklist and the location scouting checklist.

Terms used on this page

Call sheetPre-productionStoryboard

Questions

Asked before the first call

How long should pre-production last?

Long enough for every line of the list to be true. A simple corporate shoot may need one or two weeks, a commercial three or four, a feature several months.

What is the most forgotten item in pre-production?

In our experience, parking and power at the location, and written confirmation from people who said yes by phone.

When is pre-production finished?

When the call sheet for the first day can be written without a question mark.