The call sheet: one page, no questions

A call sheet tells every person where to be, when, and what will happen that day. If it is right, the day starts on time.

One click, no account. The demo is filled with sample productions and rebuilt every day.

What it is

A call sheet is the daily plan of a shoot, sent to cast and crew the evening before. It is short, factual and complete. A good one answers every practical question before anyone has to ask it.

What to put on it

  • The header. Production title, date, day number, general call time.
  • Where. Address of the location, parking, nearest hospital.
  • Who to call. Producer, coordinator, first assistant director.
  • The day. Scenes in shooting order, with location, cast and a short description.
  • Cast. Each person's call time, make-up time and on-set time.
  • Crew. Call time by department.
  • Conditions. Sunrise, sunset and the weather forecast.
  • Notes. Special equipment, safety points, meals.

When to send it

The evening before, once the previous day has wrapped and the plan is firm. Earlier and it will change. Later and people have gone to bed. Ask for a confirmation from cast.

Common mistakes

  • A call time without an address
  • An old phone number for the coordinator
  • Different call times in the email and in the attachment
  • No plan for rain on an exterior day

Where the information comes from

Everything on a call sheet already exists somewhere: the schedule, the cast list with phone numbers, the locations, the crew. When that information is kept in one application, preparing the call sheet is assembling, not hunting. In a custom version of CrewDesk, TECHMA can generate the call sheet from the project in one click.

A call sheet for a five-person crew

Small shoots need it too, in a lighter form: date, call time, address with parking, the plan of the day in five lines, everyone's phone number, the nearest hospital and what each person brings. It fits in a message, and it replaces the ten messages of the morning.

Go further

The call sheet template lists every field in a table.

Terms used on this page

Call sheetCall timeFirst assistant director

Questions

Asked before the first call

Who writes the call sheet?

Usually the second assistant director or the production coordinator, approved by the first assistant director and the producer.

What is a call time?

The time a person must be on set, ready to work. The general crew call is for most of the crew; individuals may have their own.

Should a call sheet include the weather?

Yes, with sunrise and sunset. They decide clothing, equipment protection and the order of exterior scenes.

● Rolling

See it run.

CrewDesk is a working application, not a mock-up. Open it, move a project to the next stage, assign a task, and judge it on what it does.